Skip to content
We meet your adjuster and document the damage (470) 946-6836
Roofing Hapeville logo
Brick cottage with a dark shingle roof and dormer windows in morning light

New roof, no guesswork

Roof Replacement in Hapeville

A new roof with a firm start date, a written quote and a call from us as each phase wraps up.

A New Roof Without the Runaround

You know the story. A roofer gives a price, then goes quiet. The start date slides. Nobody answers. Then one morning a crew shows up unannounced. We run replacements differently. First, an inspection. We check every slope, the flashing, vents and attic, and photograph what is failing. Second, a written quote. Every material, every quantity, and a set rate per sheet for any rotten decking we hit. Third, a start date you can plan around. Then the work. We strip it all, right to the boards. Bad decking gets swapped. Drip edge goes on, then leak barrier in the valleys and at the pipes, then synthetic underlayment across the deck. New flashing at the walls. Vents balanced so the attic breathes. Shingles nailed in the right zone and finished with matching ridge caps. On a lot of older Hapeville houses we also find a second layer hiding under the first, so we plan for it. Through all of it, you hear from us. When tear-off is done. When the roof is dried in. When the shingles are finished. When the yard is clean. Then a walkaround together, and a check-in call a while after. That is the whole difference. Same good roof. No silence.

What Comes With the Job

Most replacements include all of this.

  • Written quote

    Materials, quantities and the decking rate. On paper.

  • Confirmed start date

    Set ahead of time. If weather moves it, you hear first.

  • Down to the boards

    All old layers off, including any hidden second layer.

  • Deck repairs

    Soft or rotten sheets replaced at the quoted rate.

  • Full underlayment system

    Leak barrier at weak spots, synthetic underlayment everywhere else.

  • Metal edges and flashing

    Replaced on every job, never reused.

  • Balanced airflow

    Intake and exhaust vents sized as a pair.

  • Stage updates

    A call or text at tear-off, dry-in, shingles and cleanup.

How We Run It

  1. Look and photograph

    We inspect the roof and attic and show you photos. If a repair would do, we say so.

  2. Quote and schedule

    You get the written quote, pick your shingle or ask about metal and cedar, and lock in a start date.

  3. Build, update, clean

    Tear-off, install and cleanup, with a call at each stage. Then a walkaround and a follow-up check-in.

Why Hapeville Picks Us for New Roofs

  • You always know

    Updates at every stage. No guessing what is happening on your house.

  • No surprise costs

    The decking rate is set before the old roof comes off.

  • Done the right way

    Nail lines, underlayment and vents installed by the book.

  • Written quote
  • Set start date
  • Stage-by-stage updates
  • Yard left clean

Roof Looking Tired?

Curled edges, bald spots, granules in the gutter. Let us look, photograph it and tell you where you stand.