New roof, no guesswork
Roof Replacement in Hapeville
A new roof with a firm start date, a written quote and a call from us as each phase wraps up.
A New Roof Without the Runaround
You know the story. A roofer gives a price, then goes quiet. The start date slides. Nobody answers. Then one morning a crew shows up unannounced. We run replacements differently. First, an inspection. We check every slope, the flashing, vents and attic, and photograph what is failing. Second, a written quote. Every material, every quantity, and a set rate per sheet for any rotten decking we hit. Third, a start date you can plan around. Then the work. We strip it all, right to the boards. Bad decking gets swapped. Drip edge goes on, then leak barrier in the valleys and at the pipes, then synthetic underlayment across the deck. New flashing at the walls. Vents balanced so the attic breathes. Shingles nailed in the right zone and finished with matching ridge caps. On a lot of older Hapeville houses we also find a second layer hiding under the first, so we plan for it. Through all of it, you hear from us. When tear-off is done. When the roof is dried in. When the shingles are finished. When the yard is clean. Then a walkaround together, and a check-in call a while after. That is the whole difference. Same good roof. No silence.
What Comes With the Job
Most replacements include all of this.
Written quote
Materials, quantities and the decking rate. On paper.
Confirmed start date
Set ahead of time. If weather moves it, you hear first.
Down to the boards
All old layers off, including any hidden second layer.
Deck repairs
Soft or rotten sheets replaced at the quoted rate.
Full underlayment system
Leak barrier at weak spots, synthetic underlayment everywhere else.
Metal edges and flashing
Replaced on every job, never reused.
Balanced airflow
Intake and exhaust vents sized as a pair.
Stage updates
A call or text at tear-off, dry-in, shingles and cleanup.
How We Run It
Look and photograph
We inspect the roof and attic and show you photos. If a repair would do, we say so.
Quote and schedule
You get the written quote, pick your shingle or ask about metal and cedar, and lock in a start date.
Build, update, clean
Tear-off, install and cleanup, with a call at each stage. Then a walkaround and a follow-up check-in.
Why Hapeville Picks Us for New Roofs
You always know
Updates at every stage. No guessing what is happening on your house.
No surprise costs
The decking rate is set before the old roof comes off.
Done the right way
Nail lines, underlayment and vents installed by the book.
- Written quote
- Set start date
- Stage-by-stage updates
- Yard left clean
Roof Looking Tired?
Curled edges, bald spots, granules in the gutter. Let us look, photograph it and tell you where you stand.